NASA delays SLS moon rocket rollout however says it’s optimistic a few spring launch

However extra lately, NASA has been making important progress with the rocket. Final 12 months it performed a profitable “scorching fireplace” check, working all 4 RS-25 engines on the core stage of the rocket for over eight minutes, the identical period of time they’d fireplace throughout flight. (A primary try a pair months earlier was minimize quick after nearly one minute.) After the profitable check on the Stennis Area Middle in Mississippi, which burned 733,000 gallons of propellant, the stage was shipped to the Kennedy Area Middle, the place the stable rocket motor facet boosters have been mounted, after which the Orion crew capsule was positioned on prime of the totally assembled system.

We will be happy to hear your thoughts

Leave a reply

error: Content is protected !!
Eagle Eye Offers
Logo
Enable registration in settings - general
Compare items
  • Total (0)
Compare
0
Shopping cart